Staten Island New Installation & Immediate Compliance

Project Overview

A newly constructed Staten Island property required a fully code-compliant fire escape to obtain DOB and FDNY certification before occupancy could be approved.

The Challenge

The building could not legally receive an occupancy permit without a properly installed emergency egress system. Missing deadlines risked delayed leasing and financial penalties for the owner.

Our Approach

1

Code-Compliant System Design — We designed a fire escape system fully aligned with NYC building codes and DOB/FDNY requirements, tailored to the building's specific structural layout.

2

Precise Installation & Safe Access — The fire escape was installed with precise anchoring and structural connections, ensuring safe access at every level and meeting all load-bearing specifications.

3

Certification Documentation & Safety Checks — All required certification documentation was completed and submitted. A full safety inspection was conducted before handover to confirm compliance.

Results

  • ✓ Full compliance achieved immediately
  • ✓ Building cleared for occupancy
  • ✓ Owner avoided all delays and penalties
"

ABC handled everything from design to certification. It couldn't have been easier or safer.

RM
Rachel M.
Property Owner · Staten Island, New York